How we Refurbish and fit-out a new office suite

1. It all starts with a plan...

 

2. The original suite had not been occupied For a number of years...

 

3. The Landlord and tenant requested a total Refurbishment back to shell...

 

4. We start by demolishing the ceilings, partitions, and electrical installation.

 

5. All waste is separated for recycling and careful disposal.

 

6. The suite is stripped back to shell ready to be fully fitted out.

 

7. The first thing we do is prepare the floor and board it throughout with 6mm plywood.

 

8. Once boarded, we screed the joins for a flat level floor ready for building works.

 

9. First-fix electrical containment is installed before the ceilings are built.

 

10. The suspended ceilings are hung by laser levelling and ceiling tiles inserted.

 

11. The office partitions and walls are built with materials stacked ready for use.

 

12. The doors are now carefully hung and we keep their protective covers are kept.

 

13. Decorating commences as the ceiling lights are inserted and connected up.

 

14. As the decorating is finished, the carpets are laid and the partitions trims are fixed.

 

15. Finally, office furniture and seating is delivered and installed.

 

16. For key areas of the office, we design 3-D Visualisations...

 

17. And the final result is a truly impressive office interior, built on-time and on-budget.

 